Post Offer Free
Qingdao Intermedios Plastic Machinery Co.,LTD  

Gold Index: 5980

You are here: home  > Two Layer Gas Hdpe Pipe Manufacturing Plant Plastics Extrusion Machinery

Two Layer Gas Hdpe Pipe Manufacturing Plant Plastics Extrusion Machinery 

Place of Origin: Zhejiang, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: SJS

Two layer HDPE Gas Pipe Extruder / Extrusion Line (16mm-63mm)
 
<span style="f

Two layer HDPE Gas Pipe Extruder / Extrusion Line (16mm-63mm)

 

This Two Layer HDPE gas pipe extrusion machine is mainly used to produce HDPE pipe for water / gas supply, and sewage and drain pipe, also undergroud pipes.

The Two layer PE Gas Pipe Extrusion Line (16mm-63mm) video:https://youtu.be/3WkyB6oXQTM

Two layer PE Gas Pipe Extrusion Line (16mm-63mm) Introduction:

1. Total installed power:150Kw, 380 V three phases+N+G, 50HZ

Load factor: 55%-80%  (Actual power is 65kw)

2. Cooling circulars water: 10 m3/h

3. Compress air:0. 8m3/min

4. Workhouse: 50000×2500×2800mm(length, width and high of line) 

5. Products dimension: 16mm,20mm,25mm,32mm,40mm,50mm,63mm

6. Raw material :HDPE 80/100 

7. HDPE Pipe working Pressure:SDR9 & SDR11 

8. Max Output:160 kgs per hour 

Two layer HDPE Gas Pipe Extrusion Line (16mm-63mm) Machinery Specification:

All the HDPE pipe extrusion machine / production line:

1. Automatic Feeder and drying hopper

2.Single Screw Extruder SJ50/33

   Single Screw Extruder SJ40/33(for out layer PE pipe,thickness is 0.5-1.5mm)

   Single Screw Extruder SJ25/25(For the mark line of the PE pipe)

3. HDPE PIPE Extrusion molds (SDR11,SDR17)

4.Vacuum sizing tank

5. spray cooling tank

6.Heating printer with all letter blocks 

7. Belt haul-off unit

8. Non scrap Cutting unit:

9. Stack unit

10. Winder

11. Electric Control Cabinet

Technology and Service:

1. Seller supply full set of technical document, cutter and other full document (write in English).  

2. Seller supply training for buyer’s staff until buyer can produce the eligible production independently.  

3. Seller is responsible for installing, testing, adjusting and debugging the machines in buyer’s factory.

4. Buyer should pay the expense for our engineers including for our engineer including round-

way tickets, inland traffic, lodging and boarding fee when the machine is installed, tested and maintained.

5. Seller will go to install machines after the machine is arrived at buyer and buyer will have prepared all 

conditions (including power, water, compress air, tools and materials for producing pipe, etc) for installing 

and testing these machines. Buyer should pay 60USD/day.

6. When installing,people of both sides cooperate well and carefully,buyer supplies convenient working 

condition,any problem, should discuss peacefully and kindly.

7. Buyer supply proper working tools, equipments and other conditions.

8. The expense including the accommodation and materials of the trial-

run the machine for testing and other expenses(electric, water, air and worker) will be on seller’s account,

 if the buyer or their representatives do the inspection of the machines before shipment.

9. Guarantee period: 14 months after shipment (the date of B/L)

bigPhoto
 Mr. Wang

Tel: 86-532-92066953
Contact to this supplier

Related Search

Find more related products in following catalogs on Hisupplier.com

Related Products

Company Info

Qingdao Intermedios Plastic Machinery Co.,LTD [China (Mainland)]


Business Type:Manufacturer
City: Qingdao
Province/State: Shandong
Country/Region: China (Mainland)

You May Like:

Product (114)