Post Offer Free
Qingdao Intermedios Plastic Machinery Co.,LTD  

Gold Index: 5975

You are here: home  > PERT / Aluminum Plastic Composite Pipe Extrusion Machine 110KW 380V 50HZ

PERT / Aluminum Plastic Composite Pipe Extrusion Machine 110KW 380V 50HZ 

Place of Origin: Zhejiang, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: Single screw

PERT- Al - PERT / aluminum plastic composite pipe extrusion machine / production line
PERT- Al - PERT / aluminum

PERT- Al - PERT / aluminum plastic composite pipe extrusion machine / production line

PERT- Al - PERT / aluminum plastic composite pipe extrusion machine / production line is used to produce PERT- Al - PERT / aluminum plastic composite pipe:

 

PERT - AL - PERT  Composite Pipe specification:

Raw material: PERT - AL - PEX , Aluminum Strap, Adhesive 

Application Pipe:Hot and Cool Water Gas pipe and other usage.

Pipe sizes (mm):1216,1620,2025,2632 

PERT- Al - PERT / aluminum plastic composite pipe extrusion machine / production line power equipments :

Voltage :380 V50 HZ

Phrase: 3 Phrase 5 wires

Total : 110kw

Description of PERT- Al - PERT / aluminum plastic composite pipe extrusion machine / production line:

1Single screw extruder FSJ-50 / 28  ( Inner Layer of Pipe  )

2. Single screw extruder FSJ-30 / 28   ( adhesive glue layer ) 

3. Co-extrusion Die Head and moulds ( for inner layer PERT ) 

4, Single screw extruder FSJ-50/28  ( Outer Layer of Pipe )

5. Single screw extruder FSJ-30/28   ( adhesive glue layer )

6. Co-extrusion Die Head and moulds ( for outer layer PERT )

7. Al foil unwinding unit

8. Al foil storage unit

9. Al foil Horizontal welder ( brand of Shanghai,China )

10. Al tube forming system completely 

11. Al tube welding system

12. Water cooling tank  ( Pneumatic Festo Germany ) 

13. Water dryer

14. Jet ink printer

15. Pipe dia. Calibrator Detector

16. Haul off unit

17. Cutter

18. Winder with two coilers

19.PLC Electrical control system ( Siemens ,Schneider  )

Technology and Service:

1. Seller supply full set of technical document, cutter and other full document (write in English).  

2. Seller supply training for buyer’s staff until buyer can produce the eligible production independently.  

3. Seller is responsible for installing, testing, adjusting and debugging the machines in buyer’s factory.

4. Buyer should pay the expense for our engineers including for our engineer including round-

way tickets, inland traffic, lodging and boarding fee when the machine is installed, tested and maintained.

5. Seller will go to install machines after the machine is arrived at buyer and buyer will have prepared all 

conditions (including power, water, compress air, tools and materials for producing pipe, etc) for installing 

and testing these machines. Buyer should pay 60USD/day.

6. When installing,people of both sides cooperate well and carefully,buyer supplies convenient working 

condition,any problem, should discuss peacefully and kindly.

7. Buyer supply proper working tools, equipments and other conditions.

8. The expense including the accommodation and materials of the trial-

run the machine for testing and other expenses(electric, water, air and worker) will be on seller’s account,

 if the buyer or their representatives do the inspection of the machines before shipment.

9. Guarantee period: 14 months after shipment (the date of B/L)

bigPhoto
 Mr. Wang

Tel: 86-532-92066953
Contact to this supplier

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

Qingdao Intermedios Plastic Machinery Co.,LTD [China (Mainland)]


Business Type:Manufacturer
City: Qingdao
Province/State: Shandong
Country/Region: China (Mainland)

You May Like:

Product (114)