Qingdao Intermedios Plastic Machinery Co.,LTD
|
Place of Origin: | Zhejiang, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
HDPE / PVC / PP double wall corrugated pipe extruder / extrusion machine
HDPE / PVC / PP double wall corrugated pipe extruder / extrusion machine is used to produce plastic double wall corrugated pipe (DWC pipe).
DWC pipe is widely used for water drainage system.It is a fully computer controlled line.It features high stable output capacity,and highly automatic operation.
For HDPE,you can choose high efficient single screw extruder.
For PVC,you can choose conical twin screw extruder or parallel twin screw extruder.
Forming system consists mould and corrugator.Mold blocks can be easily changed and they have air or water cooling system.
The belling process is on line.High precision cutting can be guaranteed by cutting machine.The production line can be also be equipped with Simens PLC system.
The PE / PVC / PP double wall corrugated pipe extrusion machine video:https://youtu.be/0A8oH1zvAqI
PE / PVC / PP double wall corrugated pipe extrusion machine machines specification:
Diameter(mm) |
ø800-1200 |
ø500-800 |
ø200-400 |
ø110-250 |
ø63-160 |
Extruder |
SJ150/33, |
SJ120/30, |
SJ75/33, |
SJ90/30, |
SJ90/30, |
Total power |
950kW |
722kW |
343kW |
332kW |
100 kW |
Technology and Service:
1. Seller supply full set of technical document, cutter and other full document (write in English).
2. Seller supply training for buyer’s staff until buyer can produce the eligible production independently.
3. Seller is responsible for installing, testing, adjusting and debugging the machines in buyer’s factory.
4. Buyer should pay the expense for our engineers including for our engineer including round-
way tickets, inland traffic, lodging and boarding fee when the machine is installed, tested and maintained.
5. Seller will go to install machines after the machine is arrived at buyer and buyer will have prepared all
conditions (including power, water, compress air, tools and materials for producing pipe, etc) for installing
and testing these machines. Buyer should pay 60USD/day.
6. When installing,people of both sides cooperate well and carefully,buyer supplies convenient working
condition,any problem, should discuss peacefully and kindly.
7. Buyer supply proper working tools, equipments and other conditions.
8. The expense including the accommodation and materials of the trial-
run the machine for testing and other expenses(electric, water, air and worker) will be on seller’s account,
if the buyer or their representatives do the inspection of the machines before shipment.
9. Guarantee period: 14 months after shipment (the date of B/L)