Qingdao Intermedios Plastic Machinery Co.,LTD
|
Place of Origin: | Zhejiang, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
PVC window profile extrusion machine , plastic profile extruder
PVC window profile extruder / production line is used to produce plastic window frame , like the picture
The performance of the PVC window profile extruder machine/ production line:
No. | Item | |
1 | Materials | PVC+additives |
2 | Output | 220 kg/h |
3 | Speed | 2-4m/min |
4 | Dimension of the line | 24X1.5X2.6m |
5 | Weight | 10 ton |
6 | Power | 90kw,voltage is according the customer's requirement |
PVC window profile extruder machine / production line list:
1, SJ65 / 132 Twin screw extruder one set
2, Mould one set
3, Vaccum calibration platform one set
4, Haul-off machine one set
5, Cutter one set
6, Stacker one set
Technology and Service:
1. Seller supply full set of technical document, cutter and other full document (write in English).
2. Seller supply training for buyer’s staff until buyer can produce the eligible production independently.
3. Seller is responsible for installing, testing, adjusting and debugging the machines in buyer’s factory.
4. Buyer should pay the expense for our engineers including for our engineer including round-
way tickets, inland traffic, lodging and boarding fee when the machine is installed, tested and maintained.
5. Seller will go to install machines after the machine is arrived at buyer and buyer will have prepared all
conditions (including power, water, compress air, tools and materials for producing pipe, etc) for installing
and testing these machines. Buyer should pay 60USD/day.
6. When installing,people of both sides cooperate well and carefully,buyer supplies convenient working
condition,any problem, should discuss peacefully and kindly.
7. Buyer supply proper working tools, equipments and other conditions.
8. The expense including the accommodation and materials of the trial-
run the machine for testing and other expenses(electric, water, air and worker) will be on seller’s account,
if the buyer or their representatives do the inspection of the machines before shipment.
9. Guarantee period: 14 months after shipment (the date of B/L)